We carry out tests on Lightning Protection Systems in industrial plants, Power Generating Units, Transmission Lines, Substations up to 500 kV (AC) and HVDC Links (High Voltage Direct Current).
PWM carries out the field measurement process of resistance and grounding continuity, field surveys of the installation`s Atmospheric Discharge Protection System in compliance with IEEE Stardand 80 and IEEE Standard 81;
We carry out a complete verification of the Lightning System components regarding their integrity, preparation of a technical report, indicating any deficiencies and suggesting improvements.